Call (954) 378-8564
Home / Blog / Concrete Block Homes From the 1960s

Running New Wiring in a 1960s Concrete Block House

A concrete block house from the 1960s is strong, solid and cool in summer, but it does not welcome new wiring the way a wood framed house does. Every added outlet, light or circuit has to find a path through masonry. This guide explains how those paths are chosen, what the work looks like, and how owners can plan a project that is sound and tidy.
Illustrative photograph

How a house of that era was originally wired

Concrete block became a favorite building material across South Florida in the middle of the twentieth century. It resists wind, termites and fire, and it suits the climate well. Many homes from the 1960s in Broward County were built this way, usually as single story ranch style houses on slab foundations, with a flat or low pitched roof and a carport or garage. If you own one, you probably already know how solid it feels.

The electrical systems in those houses reflected the habits of the time. Electricians generally ran wiring above the ceiling, in the attic, and brought it down into the walls to reach switches and outlets. Outlet boxes were set into the block as the walls were built, or into furring strips attached to the block, and the wires were fed to them through channels or conduit. In some homes, conduit was embedded in the walls or in the slab itself. In others, cables ran inside the hollow cores of the block, a layout that allowed a single path from the ceiling to a box.

The number of circuits was small by modern standards. A typical house might have a main panel with a modest number of breakers, one circuit for the kitchen, one for the laundry, a few general circuits for lighting and outlets, and a separate line for the air conditioning, if the home had it. Many original houses were built before central air conditioning was common, so cooling equipment was added later, with new wiring routed from the panel by the quickest path available.

Outlets were spaced fewer and farther between than today. A bedroom might have one outlet on each of two walls. Living rooms often had two or three. Kitchens had a few at counter height and one for the refrigerator. Garages might have a single outlet and a ceiling light. Bathrooms often had an outlet only in the light fixture over the mirror, or one outlet next to the sink without ground fault protection.

Some houses were wired with materials that deserve a second look today. Cloth or rubber insulated wiring, ungrounded two wire cables and older types of panels and fuse boxes were common. Not every house has all of these, and not every one that does is unsafe, but each is a reason to have an electrician look rather than assume.

Later renovations added layers. Over sixty years, a typical block house may have had a kitchen update, a bathroom update, an added air conditioner, a new roof and a few other repairs. Each change may have introduced new wiring by whatever method was easiest, sometimes surface mounted conduit, sometimes cables in the attic. Reading the house means reading these layers, one by one.

Why masonry changes the way wiring work is done

In a wood framed wall, an electrician can drill through studs, fish a cable between two points, and patch a small hole in drywall. In a block wall, that approach does not work. The wall is a solid mass with hollow cores, and getting wire through it requires different tools and different planning.

The first challenge is that block cores are filled in some places and open in others. A wall may have cores filled with concrete and steel reinforcement at regular intervals, especially near corners, openings and tie beams. Cutting into a filled core takes heavy tools, and cutting through reinforcement is not something an electrician should do casually. Structural elements need to be left alone.

The second challenge is that the wall surface may be plastered, painted, tiled or covered with furring and drywall. Whatever sits on the block has to be opened to make a path, and then restored. Plaster patching, in particular, can be visible if done in a hurry.

The third challenge is moisture. Block is porous. In a coastal climate, humidity moves through the wall, and if a cable or box is buried without suitable protection, moisture can reach the wire. This is why many electricians prefer conduit in masonry, since it provides a protected path and allows wire to be replaced later without opening the wall again.

The fourth challenge is dust and noise. Cutting masonry with a grinder or chasing tool produces fine dust that travels. Good contractors set up containment, use dust collection, and cover floors and furniture. If you live in the house during the work, ask how dust and noise will be handled.

The fifth challenge is the unknown. Walls from the 1960s may hold surprises: old conduit that is not mapped, abandoned wiring, patched channels, or plumbing running through the same spaces. Before cutting, a careful electrician uses a scanner, studies the attic and looks at where existing boxes are located. Even so, the first cut is sometimes an exploratory one.

None of this means that block houses cannot be rewired or added to. It means that the work follows a different logic. Instead of asking where a cable can be pulled, the electrician asks where the cleanest and least destructive path exists. The answer is often along the ceiling, across the attic and down through a single carefully chosen channel, or through surface mounted raceway where the look is acceptable. A good plan starts with that question, and it benefits from a visit to see the house as it is.

The main ways new wiring reaches a block wall

There are several accepted methods, each with its own trade offs. Which one suits a given job depends on the wall finish, the location of the new device and how visible the result may be.

Attic drops. If the new outlet or switch is on a wall below an accessible attic, the electrician can run the wire across the attic, then bring it down the wall in a chase or through a core, ending in a new box. This often leaves the least visible mark. It depends on the structure above: flat roofs and low attics can make access difficult.

Chasing the wall. A narrow channel is cut into the block or plaster, conduit or cable is laid in, and the channel is patched. This hides the wiring but takes time, produces dust and requires careful patching and repainting. It is best when the finish is going to be redone anyway.

Surface raceway. A metal or plastic channel is mounted on the wall surface, carrying the wire and holding the outlet or switch. It is quick, avoids cutting, and leaves the wiring accessible for future changes. The downside is appearance. In a garage, laundry room or workshop, it is often the sensible choice. In a living room, owners sometimes accept it for a single run in a discreet spot.

Conduit on the wall with surface boxes. Similar to raceway but with metal or rigid plastic tubing and boxes. Common in garages and outdoors where the look is utilitarian.

Through the slab. Some houses have conduit embedded in the floor slab. If it is accessible and sound, it can be reused. If not, cutting the slab for new conduit is a large job that is generally avoided.

Furring walls. Where a room is already being finished, a thin wall of furring strips and drywall can be built in front of the block, creating space for boxes and cables. This costs room space but gives a modern wall that is easy to wire. In a small house, the loss of an inch or two may matter.

Wireless or low voltage alternatives. Some goals, such as lighting control or doorbell function, can be met by wireless devices or low voltage wiring, which are far easier to install in masonry.

Often a project blends methods: an attic drop for most of the route, a short chase at the end, and surface raceway in the garage. Be wary of anyone who promises that every method is simple. A frank conversation about where wiring will show and where walls will be patched is part of a good estimate.

Outdoors, wiring on the exterior block wall should be in conduit approved for the location, fastened properly, with boxes and covers rated for wet locations. Salt air favors materials that resist corrosion, as covered elsewhere in this series of guides.

What a typical project looks like from start to finish

Understanding the sequence helps you prepare. The following describes a typical project, such as adding several outlets and a new circuit for a kitchen remodel in a 1960s block house. Your job may differ, but the rhythm is similar.

It begins with a phone call. You describe the house, what you want added, and any current problems. The person on the phone can ask about the age of the panel, the number of rooms and whether there is an attic. A quote begins here, but for work in masonry it cannot be finished without a visit.

On the visit, the electrician walks the house, looks at the panel, checks the attic if accessible, tests outlets, and looks at the places where new devices would go. They may use a scanner on the walls. They will ask about plans for finishes, because painting, tile and cabinet work interact with wiring. They will explain which methods suit each location and what will be visible.

Next comes a written scope. This lists the work in plain terms: new circuits, outlets, switches, panel changes if needed, and the method for each run. It should state who handles permits and patching. Patching and painting are sometimes outside the electrician's scope, and you should know that ahead of time.

Once you agree, a permit is requested where required. Scheduling follows. If the power will be off for a period, plan around it.

On the first day, the crew protects floors and furniture, locates the planned routes and starts rough work: running conduit or cable, setting boxes, chasing walls if that is the plan. Dust is the main nuisance. Expect noise during cutting.

The rough inspection may be required by the city before walls are closed. Do not patch until it passes. After approval, the electrician or another trade patches the channels, and finishes are applied.

Then comes trim work: installing outlets, switches, covers, fixtures and breakers. The panel is labeled. Protective devices are tested. The electrician demonstrates how the new circuits work.

A final inspection closes the permit. Keep the paperwork with your house records.

A short worked example shows how choices play out. An owner wanted a countertop outlet moved and two more added, with a new line for a built in oven, in a kitchen with painted block walls. The electrician proposed an attic drop for the oven line, a short chase behind the cabinets for the outlets, and a surface raceway only in the utility room. The owner chose to repaint the kitchen after the work, so the chase patches did not need to match existing paint exactly. The plan avoided any visible surface wiring in the main rooms. The point of the example is that decisions about finishes and wiring are linked, and talking them through before work begins avoids disappointment.

Protecting the walls and the wires once the work is done

New wiring in an old block house deserves protection from the same forces that aged the original. Salt, humidity and settling are persistent, and a few precautions extend the life of the work.

Choose suitable materials. In damp or exposed locations, conduit and boxes made of corrosion resistant materials last longer than bare steel. Fittings should be tight and sealed where they enter boxes. Ask your electrician which products they use and why.

Seal where wires pass through walls. Gaps around conduit and cables are paths for moisture and insects. Where wires pass through the exterior wall, a proper sealant and fittings designed for the purpose keep rain out.

Use ground fault protection on circuits in kitchens, baths, laundry, garage and outdoors, and consider arc fault protection on bedroom and living area circuits where the code calls for it. These devices guard against hazards that older houses lacked protection against.

Consider surge protection. A whole house protector at the panel, along with plug in protectors for sensitive equipment, softens the effect of the voltage spikes that summer storms bring.

Label the panel. A clear, accurate directory saves time during emergencies and future work. Put the labels in pencil or on a printed card, and update them when circuits change.

Leave access. Do not bury junction boxes behind finished walls. Every splice should be inside a box that stays reachable. If a junction must be hidden, discuss it with the electrician and the permit office, since the code is strict about this.

Watch for cracks. Block homes settle, and cracks sometimes form in plaster or masonry. Hairline cracks are common, but cracks that cross a wiring channel can strain conduit and cable. Report any growing crack near an outlet or panel.

Keep a record. Take photographs of walls before they are closed, showing where cables and conduit run. A simple sketch of the house labeled with circuit routes will help the next person to work on the house, and you. In masonry, where you cannot see behind the wall, such a record is worth a great deal.

Finally, test regularly. Press the test buttons on protective devices monthly, check for warm outlets after a few weeks of use, and pay attention to buzzing or flickering that may suggest a loose connection. New work should settle in quietly, and anything unusual deserves a call back.

Planning, permits and the questions worth asking

A project in a block house benefits from planning more than most. Because changes to the walls are harder to undo, it pays to think through what you want before the first cut.

Start with a wish list. Walk through each room and note where you wish you had an outlet, a switch, a light or a dedicated circuit. Think about future uses, such as a home office, a workshop or a wall mounted television. Consider the furniture layout, since outlets that look good on paper may end up behind a bed.

Group the work. Doing several things at once costs less in dust, time and patching than doing them in separate visits. If you are repainting or renovating a room, wire first.

Ask about the panel. In many 1960s houses, the panel has little spare capacity. If your wish list includes more than a few new circuits, the electrician may recommend a panel change or an added sub panel. This is also an opportunity to add surge protection and update labeling.

Ask about permits. Panel changes, new circuits and service work in Dania Beach generally require permits, and the city permit office can confirm what applies to your address. A permit adds inspection, which is a benefit. It also helps with insurance and with the eventual sale of the house.

Ask these questions of any electrician you consider:

  • How do you plan to route the new wiring, and what will be visible afterward?
  • Who patches and paints the walls?
  • Will the work be done under a permit, and who arranges inspections?
  • What will you do if you find old or unexpected wiring behind the wall?
  • How will you control dust and protect the house?
  • Will the panel be relabeled and protective devices tested?

Be honest about the budget and the schedule. If funds are limited, a staged approach, with safety items first and convenience items later, works well. A good electrician will help you set priorities, and will tell you which things must be done together.

One more subject belongs in the plan, and that is the air conditioning. Many 1960s block houses had cooling added later, and the wire feeding the outdoor unit was often run along the quickest path, sometimes surface mounted along an exterior wall with a disconnect nearby. If you are replacing the system, the new equipment may need a different breaker size and wire size, and the old disconnect may not match. Ask the air conditioning contractor for the electrical requirements of the new unit before the install day, and share them with your electrician, so the circuit can be checked or replaced in advance. A system that arrives on a truck and finds an undersized circuit wastes a day for everyone. The same advice applies to a water heater, a pool pump or a dryer: get the nameplate details first, then match the wiring to them.

Also think about the slab. In a house with conduit embedded in the floor, you may be able to reuse existing runs for low voltage or communication cables, such as network lines for a home office. A conduit that has stayed dry for sixty years can be a gift, and a conduit that has filled with water or silt is a warning. An electrician can test a run by pulling a line through it, and the result tells you whether the path is usable.

Finally, remember what you have. A 1960s block house is a durable home, and its walls will outlast many trends. Wiring it thoughtfully, with the right methods and materials, lets it serve for decades more. A conversation by phone is a good place to begin, and a visit to see the house itself is where a real plan is made.

Talk to us

Planning outlets or circuits in a block house? Call and describe the rooms. A quote can start by phone, and masonry walls call for an on site visit.
Call (954) 378-8564
Call (954) 378-8564